Dubai RTA Completes World Trade Centre Roundabout Project With Final Bridge Opening October 30 2026

What happened
Dubai’s Roads and Transport Authority (RTA) will open the final 1,000-metre bridge of the Dh696 million World Trade Centre roundabout transformation on October 30, 2026.
The Context
* The final link completes a 5,000-metre bridge network, converting the historic World Trade Centre roundabout into a multi-level, free-flowing junction serving over 500,000 daily commuters and visitors. * Corridor travel times drop significantly, with transit between Al Majlis Street and 2nd December Street falling from six minutes to one minute, while overall intersection wait times decrease from 12 minutes to 90 seconds. * Strategic commercial access expands, directly unlocking smoother arterial links across Sheikh Zayed Road, the Dubai World Trade Centre exhibition district, and DIFC financial corridors alongside communities like Zaa’beel and Al Satwa.
The Number
vehicles per hour will now move across the newly opened two-lane span, unlocking direct transit capacity right where Dubai's financial hub meets the central exhibition district.
Takeaway
As the roundabout project wraps, attention turns to the complementary Al Mustaqbal Street development set for 2027, which will boost corridor capacity by another 33 percent.
UAE-based English-language newspaper covering regional politics, economics, and global affairs.
"The National reflects Emirati policy perspectives while maintaining international editorial standards."
— A47 Editor
Final bridge at Dubai World Centre roundabout to open on Friday
The final bridge at the Dubai World Centre roundabout is set to open on Friday, marking the completion of the structure at the junction in Dubai, according to a report published by The National.
English-language coverage focused on UAE news, government updates, and domestic affairs.
"Emirates 24|7 reflects a mainstream UAE editorial perspective with strong emphasis on official and domestic developments."
— A47 Editor
Dubai RTA to open final Trade Centre Roundabout bridge
Dubai's Roads and Transport Authority (RTA) will open the final bridge of the World Trade Centre Roundabout Development Project on Friday, 30 October 2026. The new 1,000-metre, two-lane bridge has a capacity of about 3,000 vehicles per hour and carri...
Arabic-language local coverage focused on UAE domestic issues, civic affairs, and community reporting.
"Emarat Al Youm local coverage emphasizes UAE institutions, public services, and community-level developments."
— A47 Editor
«طرق دبي» تفتتح الجسر الأخير ضمن مشروع تطوير دوار المركز التجاري الجمعة المقبل «طرق دبي» تفتتح الجسر الأخير ضمن مشروع تطوير دوار المركز التجاري الجمعة المقبل
Roads and Transport Authority (RTA) Dubai will open the final bridge within the development project of the Mall Roundabout next Friday, October 30, according to the base report published by Emarat Al Youm. The project is described as the last phase o...
Breaking news and analysis from the UAE and Gulf region.
"Khaleej Times is a long-running UAE publication with broad regional coverage."
— A47 Editor
Final bridge of Dubai's World Trade Centre roundabout project to open on October 30
Final bridge of Dubai's World Trade Centre roundabout project is set to open on October 30, according to Khaleej Times, marking the completion of the last major structure in the development of the roundabout.