Trending

    Dubai Municipality Awards Dh3 Billion in Contracts for Phase 3 Tasreef Stormwater Drainage Expansion

    Section editor: ·Low5 articles covering this·5 news sources·Updated 2 hours ago·UAE
    Share:
    Infographic showing Dh3 billion Tasreef stormwater drainage network expansion across Dubai corridors

    What happened

    Dubai Municipality awarded four contracts valued at Dh3 billion under Phase 3 of the Tasreef Programme to build 100 km of stormwater drainage lines across nearly 100 square kilometres.

    The Context

    • Targeting prime commercial corridors: The network targets key areas including Sheikh Zayed Road, Al Khail Road, Jumeirah, Al Quoz, and Al Wasl to secure major arterial transit lines.
    • Scaling total capacity: The wider Dh30 billion Tasreef initiative is designed to raise Dubai's overall stormwater capacity by 700 percent, managing over 20 million cubic metres of water daily by 2033.
    • Aligning with long-range urban goals: The project operationalizes goals from the Dubai 2040 Urban Master Plan, addressing municipal climate resilience following the rainfall events of April 2024.

    The Number

    Dh3 billion

    The capital deployed for this project phase delivers 100 km of main stormwater lines up to 3 metres in diameter, mitigating transit disruptions and protecting real estate value across key business districts.

    Takeaway

    As engineering teams initiate Phase 3 construction, expect localized traffic diversions along central arterial routes while the municipality scales long-term urban flood protections through 2033.

    5 Articles
    The National

    Dubai awards Dh3 billion in contracts to expand stormwater drainage network

    Dubai has awarded Dh3 billion in contracts to expand the emirate's stormwater drainage network, according to The National. The base report centres on the city's infrastructure investment to manage heavy rainfall.

    Khaleej Times

    Dubai to add around 100 km of main lines to enhance stormwater drainage

    Dubai is set to add around 100 km of main stormwater drainage lines to enhance its capacity to handle heavy rainfall, according to Khaleej Times. The project follows a period of unstable weather in the emirate, with thunderstorms and rain forecast by...

    Emirates 24|7

    Dubai Municipality awards AED3 billion in contracts for four Phase 3 Tasreef stormwater drainage projects

    Dubai Municipality has awarded four new projects under Phase 3 of the Tasreef Programme, valued at a total of AED3 billion, to construct and extend about 100 kilometres of main stormwater drainage lines with diameters of up to 3 metres. The projects ...

    Emarat Al Youm

    دبي ترسي عقود 4 مشاريع جديدة لتطوير شبكة تصريف مياه الأمطار دبي ترسي عقود 4 مشاريع جديدة لتطوير شبكة تصريف مياه الأمطار

    Dubai Municipality has awarded contracts for four new projects under the third phase of the "Tasreef" program to develop the rainwater drainage network, at a total cost of AED 3 billion, according to a report published by Emarat Al Youm on October 25...

    Gulf News

    Battling rain: Dubai awards Dh3 billion contracts to add 100km of stormwater drains

    Dubai has awarded contracts worth Dh3 billion to construct and extend about 100 kilometres of stormwater drainage lines, as the emirate seeks to strengthen its defences against heavy rainfall. The projects form part of Phase 3 of the Tasreef Programm...

    Gulf News

    Battling rain: Dubai awards Dh3 billion contracts to add 100km of stormwater drains

    Dubai has awarded contracts worth Dh3 billion to construct and extend about 100 kilometres of stormwater drainage lines, as the emirate seeks to strengthen its defences against heavy rainfall. The projects form part of Phase 3 of the Tasreef Programm...